short term projects
2008
short term & workshop projects
  • fold up
    2008

    by means of laser cutting perforated two-dimensional metal sheet material bend into three-dimensional shapes.
  • rapid prototyping
    2008

    alternative plaster cast manufactured by rapid prototyping. After three-dimensional scanning of the injured area a preseted mesh will be transformed around the scanned data. This mesh consists of two seperate parts which are kept together by a click lock. This construction allows the user to wear it under water. Closely linked to this is the ability to clean the injured area.
  • shelving system
    2009

    the modular structure allows the user to create his individual organisation structure. each unit consists of a back wall and three boxes of different size. units are available in different colours and can be combined.
  • one for two
    2007

    two seperate objects of the same size producing a harmonic whole together.